Close
Home
Help
Library
Login
FAO Staff Login
Register
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Digital Asset Management (DAM) by Orange Logic
Go to Login page
Hide details
Alternative Versions
Explore More Collections
Conceptually similar
REPUBLIC OF KOREA 1972. Watershed Development and Food Control
REPUBLIC OF KOREA 1972. Watershed Development and Food Control
REPUBLIC OF KOREA 1972. Watershed Development and Food Control
REPUBLIC OF KOREA 1972. Watershed Development and Food Control
REPUBLIC OF KOREA 1972. Watershed Development and Food Control
REPUBLIC OF KOREA 1972. Watershed Development and Food Control
REPUBLIC OF KOREA 1972. Watershed Development and Food Control
REPUBLIC OF KOREA 1968. WFP Food Control
REPUBLIC OF KOREA 1968. WFP Food Control
REPUBLIC OF KOREA 1968. Flood control
REPUBLIC OF KOREA 1970. Coastal Fishing Training Centre
REPUBLIC OF KOREA 1968. Flood control
REPUBLIC OF KOREA 1968. Flood control
REPUBLIC OF KOREA 1968. Pre investment Survey of Naktong River basin
REPUBLIC OF KOREA 1968. FAO assignment
REPUBLIC OF KOREA 1966. Farmer with barley crop
REPUBLIC OF KOREA 1968. FAO assignment
REPUBLIC OF KOREA 1968. FAO Assignment, Republic of Korea
DPR KOREA 1968. Deep-sea Fishing Training Centre
DPR KOREA 1968. Deep-sea Fishing Training Centre
Similar tones
View images with similar tones
Add to collection
REPUBLIC OF KOREA 1972. Watershed Development and Food Control
1972 (exact date unknown). Rep. of Korea. The signboard shows how the Gongji Chon area will look upon completion of the current WFP project there.
01/01/1972
Country
Democratic People's Republic of Korea
Credit
© FAO/S. Yokoi
UNFAO Source
FAO Photo Library
File size
919.44 KB
Unique ID
UF12TJ1
FAO. Editorial use only. Photo credit must be given.
Background Information
The Republic of Korea suffers from intensive rainfall during the summer season and because of the general topography of the country, the short and swift rivers frequently break their banks endangering lives, households and farmlands. Sometimes, during the monsoon season, a single day's rainfall can be as much as 354 millimetres. Part of the Government's economic development plan includes the designing of flood control measures and watershed managment, such as the building or renewal of river banks and canals, and land development - not only to protect lives and property, but also to bring more land under cultivation to meet the demands of an ever-increasing population. The UN/FAO WFP is assisting several of these projects by providing rations of wheat flour to the local workers who have been generally underemployed or unemployed. The total cost to WFP of the four related projects is approximately $10,000,000.